Contract workflows
Two versions of a contract workflow sit side by side. You check them box by box, and you still can’t say what changed.
Two flowcharts, box by box
It’s audit week. Someone needs to know why a supplier contract was signed by only one person.
You open the workflow that sent it. Then you open last quarter’s version beside it.
Each one is a flowchart of boxes and arrows: draft, review, approve, sign. You read them box by box, left to right, then back again.
Somewhere in there, a step moved. The system knows, because it kept every version. It just won’t tell you.
Nobody could see what changed, or why
I was Lead Product Designer at Netlex from 2021 to 2026. Netlex makes software for the whole life of a contract, for large legal teams.
A contract workflow is legal content that runs every day. The people who change it are lawyers and their teams, not engineers.
The platform did its job. It stored every version and ran every step. But put two versions side by side, and it had nothing to say.
Finding the change was only half the problem. Even when someone found the moved box, nobody had written down why it moved.
So audits took days. The work wasn’t hard. It was just invisible.
Edits are not the same as intent
My first answer was a better change log. It listed every edit in order: step moved, approver swapped, rule renamed.
It was complete, and nobody could use it. A lawyer doesn’t ask which box moved. They ask what the contract will do now.
So we turned the log around. Each change leads with what it means, in one plain sentence. The edit comes second, for anyone who wants to check it.
Try it here. The workflow is invented, but the idea is the one we shipped.
What version 2 changes · saved by Rowan Atlas
Approval now needs legal before finance.
Because finance kept approving terms that legal changed afterwards, so contracts went round twice.
- Legal reviews before finance approves.Moved Legal review from step 4 to step 3.
- Contracts over 250k need a second signer.Added a step after Finance approval.
- Owners hear about renewals 90 days ahead, not 30.Changed the reminder from 30 to 90 days.
What version 2 changes · saved by Rowan Atlas
Approval now needs legal before finance.
Because finance kept approving terms that legal changed afterwards, so contracts went round twice.
- Legal reviews before finance approves.Moved Legal review from step 4 to step 3.
- Contracts over 250k need a second signer.Added a step after Finance approval.
- Owners hear about renewals 90 days ahead, not 30.Changed the reminder from 30 to 90 days.
The diff itself became one canvas. Both versions sit on top of each other, like tracing paper over a drawing.
- 1Legal reviews before finance approves.Moved Legal review from step 4 to step 3
- 2Contracts over 250k need a second signer.Added a step after Finance approval
- 3Owners hear about renewals 90 days ahead, not 30.Changed the reminder from 30 to 90 days
We put both versions on one canvas. Only what changed keeps its colour, and each change is written as what it means before what moved.
Rebuilt in code with invented data. The real product is under NDA.
- Note 1: A dashed arrow shows where Legal review used to sit, so a move reads as a move, not as one step deleted and another added.
- Note 2: Steps that stayed the same turn grey and step back, so the eye lands on the three that matter.
- Note 3: Each card leads with the meaning in a plain sentence. The edit sits underneath, for anyone who wants to check it.
A team of two became ten
When I joined, there were two designers. By the end there were ten.There were two of us when I joined and ten by the end. Ten people can drift into ten ways of drawing one button, so we built one Storybook library and wrote down how to add to it. Most of what we made, we made together.
Ten designers can drift into ten ways of drawing one button. So we built a shared component library in Storybook, and wrote the rules for adding to it.
The engineers built from the same parts we designed with. Less got lost between a sketch and a release.
Product managers brought the deadlines and kept the scope honest. The lawyers who used the Workflow Designer every day were the final judges. If a change card made them stop and ask, it went back to the team.
The same care reached editing. Ten or more people could work in one workflow at once,A contract workflow belongs to a whole legal team, not one person. Presence shows who is on which step, so two people don’t rewrite the same approval at once. so everyone could see who else was there before they collided.
- v7Legal now reviews before finance approves.Live3 steps changed
- v6Renewal notices go to the contract owner, not the requester.1 step changed
- v5Contracts under 10k skip the department review.2 steps changed
- v4Every region signs through the same signature step.4 steps changed
- v3Contracts with personal data get a privacy review.1 step changed
- RARowan AtlasEditing Finance approval
- MFMarlo FinchCommenting on Legal review
- IOInes OkoroViewing History
- SVSana VeldeViewing Signature
Versions are named by what they change for the contract, and everyone in the workflow can see who else is there before they edit.
Rebuilt in code with invented data. The real product is under NDA.
- Note 1: The name of a version is its intent, not a number or a timestamp.
- Note 2: The count of changed steps opens the diff for that version.
- Note 3: Presence shows who is editing which step, so two people don’t rewrite the same approval at once.
Audits in hours, not days
For the people running an audit, the change was simple. They stopped reading two flowcharts. They read a short list of sentences, each pointing at the steps it changed.
Audits got 70% faster, from days to hours.Audit week used to start with someone asking why a supplier contract had only one signature. Now the answer is a sentence, pointing at the version that contract ran on.
People also chose to use it more. Use of the Workflow Designer grew 300% in six months.That’s use of the Workflow Designer in the six months after the redesign went out. The lawyers who worked in it every day were the final judges. If a change card made them stop and ask, it went back to the team.
- 2 Febv6 went liveIORenewal notices go to the contract owner, not the requester.
- 3 MarSA-2291 signed on v6One signer, as v6 asked.
- 12 Marv7 went liveRAContracts over 250k need a second signer.
An audit starts from the contract and walks back through the versions it ran on, in sentences an auditor can quote.
Rebuilt in code with invented data. The real product is under NDA.
- Note 1: Every contract shows the version it actually ran on, not the one that is live today.
- Note 2: The trail is made of the same intent sentences people wrote when they saved each version.
- Note 3: The finding is plain enough to paste into the audit report.
What I’d tell the next team
Describe a change by what it means, then by what moved. People ask about outcomes. The edit is the proof, so it comes second.
A diff people can’t read is the same as no diff. Keeping every version felt like being open. It wasn’t, until someone could see the difference.
Write the rules for shared parts before the team grows. A component library is a team’s memory. Rules written late are rules nobody follows.